The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Guilds/Alpha/Current Projects"

From ATITD5
Jump to navigationJump to search
Line 13: Line 13:
 
|-
 
|-
 
| [[Clinker Vat]] || 10 [[Copper Sheeting]], 60 Cut Stone, 2500 Firebricks ||
 
| [[Clinker Vat]] || 10 [[Copper Sheeting]], 60 Cut Stone, 2500 Firebricks ||
 +
|-
 +
| [[Gyration Cell]] ||  1000 Boards, 500 Clay, 250 [[Concrete]], 50 [[Copper Sheeting]], 12 [[Crucibles]], 20 [[Glass Pipe]], 100 Leather, 50 [[Moon Steel]], 10 Pulleys, 25 [[Tin Sheeting]] ||
 
|-
 
|-
 
|}
 
|}

Revision as of 02:15, 17 September 2010

http://www.atitd.org/wiki/tale5/Alpha

Name Cost Notes
Hades Furnace 2 Aluminum Plate, 5000 Boards, 5000 Clay Bricks, 100 Copper Sheeting, 30 Crucibles, 500 Cut Stone, 24 Pulley, 20 Fine Glass Pipe, 75 Iron Bars, 75 Iron Strap, 300 Steel Sheeting, 3 Thermometer, 15 Tin Sheeting
Deep Well 200 Rope, 400 Boards, 300 Nails, 20 Screw Gear, 500 Oil, 2000 Leather
Pottery Deck 240 Boards, 500 Limestone, 60 Flystone, 200 Bearings, 300 Oil
Vault Kiln 15000 Firebricks, 50 Sheet Glass, 3 Thermometer
Clinker Vat 10 Copper Sheeting, 60 Cut Stone, 2500 Firebricks
Gyration Cell 1000 Boards, 500 Clay, 250 Concrete, 50 Copper Sheeting, 12 Crucibles, 20 Glass Pipe, 100 Leather, 50 Moon Steel, 10 Pulleys, 25 Tin Sheeting