The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Desert Obelisk"
(Created page with "{{Template:BuildingInfo|image=Desert_Obelisk.jpg|size=n/a|where=where::Small Construction Site|description=First obelisk type.}} The Desert Obelisk was the first obelisk typ...") |
|||
Line 1: | Line 1: | ||
{{Template:BuildingInfo|image=Desert_Obelisk.jpg|size=n/a|where=[[where::Small Construction Site]]|description=First obelisk type.}} | {{Template:BuildingInfo|image=Desert_Obelisk.jpg|size=n/a|where=[[where::Small Construction Site]]|description=First obelisk type.}} | ||
− | + | {{5}}{{5}}{{5}}{{5}}{{5}} | |
The Desert Obelisk was the first obelisk type available to the people of Egypt. It is built to pass the [[Test of the Obelisk]] (or the principle thereof), or simply for decoration. | The Desert Obelisk was the first obelisk type available to the people of Egypt. It is built to pass the [[Test of the Obelisk]] (or the principle thereof), or simply for decoration. | ||
Revision as of 23:33, 12 August 2010
Size | N/A |
Where | Small Construction Site |
The Desert Obelisk was the first obelisk type available to the people of Egypt. It is built to pass the Test of the Obelisk (or the principle thereof), or simply for decoration.
This type of obelisk requires bricks, boards, clay, dried flax, flint, linen, and slate to build. As with all obelisks, it is built in a Small Construction Site, where the builder defines the size of the obelisk-to-be in cubits. The taller the obelisk, the greater the material requirements.
Source
This building becomes available when you learn the Obelisk Construction* tech. You must also have started the Test of the Obelisk.
*Note that this tech CANNOT be taught. You must learn it from the University.
Time Required To Hold Power
7 Egyptian days = approx. 2 days, 8 hours real time.
Material Requirements by Size
Built in a Small Construction Site.
Height | Bricks | Boards | Slate | Dried Flax | Clay | Linen | Flint |
---|---|---|---|---|---|---|---|
7 | 231 | 23 | 5 | 3 | 24 | 7 | 1 |
8 | 280 | 28 | 6 | 4 | 28 | 9 | 2 |
9 | 333 | 34 | 7 | 5 | 32 | 10 | 2 |
10 | 390 | 40 | 9 | 7 | 36 | 11 | 3 |
15 | 735 | 75 | 16 | 16 | 60 | 19 | 6 |
20 | 1180 | 120 | 27 | 27 | 86 | 27 | 10 |
30 | 2370 | 240 | 54 | 58 | 150 | 47 | 23 |
40 | 3960 | 400 | 89 | 102 | 226 | 71 | 40 |
50 | 5950 | 600 | 133 | 157 | 316 | 99 | 61 |
60 | 8340 | 840 | 186 | 223 | 420 | 130 | 87 |
65 | 9685 | 975 | 215 | 261 | 476 | 147 | 101 |
70 | 11130 | 1120 | 248 | 302 | 536 | 166 | 116 |
80 | 14320 | 1440 | 318 | 392 | 666 | 205 | 152 |
90 | 17910 | 1800 | 397 | 494 | 810 | 248 | 191 |
100 | 21900 | 2200 | 484 | 608 | 966 | 296 | 234 |
110 | 26290 | 2640 | 581 | 733 | 1136 | 347 | 281 |
120 | 31080 | 3120 | 686 | 871 | 1320 | 402 | 335 |
130 | 36270 | 3640 | 799 | 1020 | 1516 | 461 | 391 |
140 | 41860 | 4200 | 922 | 1180 | 1726 | 524 | 452 |
150 | 47850 | 4800 | 1053 | 1353 | 1950 | 591 | 518 |
200 | 83800 | 8400 | 1839 | 2392 | 3266 | 984 | 913 |
250 | 129750 | 13000 | 2842 | 3726 | 4916 | 1475 | 1419 |
300 | 185700 | 18600 | 4063 | 5354 | 6900 | 2064 | 2037 |