The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Guilds/Alpha/Current Projects

From ATITD5
Revision as of 15:48, 23 September 2010 by Maata (talk | contribs)
Jump to navigationJump to search

http://www.atitd.org/wiki/tale5/Alpha

Name Cost Notes
Hades Furnace 2 Aluminum Plate, 5000 Boards, 5000 Clay Bricks, 100 Copper Sheeting, 30 Crucibles, 500 Cut Stone, 24 Pulley, 20 Fine Glass Pipe, 75 Iron Bars, 75 Iron Strap, 300 Steel Sheeting, 3 Thermometer, 15 Tin Sheeting
Deep Well 200 Rope, 400 Boards, 300 Nails, 20 Screw Gear, 500 Oil, 2000 Leather
Pottery Deck 240 Boards done, 500 Limestone done, 60 Flystone Done, 200 Bearings, 300 Oil done mats in stone wh
Clinker Vat 10 Copper Sheeting, 60 Cut Stone, 2500 Firebricks Done
2 Gyration Cell 1000 Boards(DONE), 500 Clay, 250 Concrete, 50 Copper Sheeting, 12 Crucibles DONE, 20 Glass Pipe, 100 Leather, 50 Moon Steel (DONE), 10 Pulleys (DONE), 25 Tin Sheeting numbers are for each
Paper Press 40 cut stone, 1 pinch roller , 4 med gears, 200 oil