The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Amigos
From ATITD5
Public Works
Located in Sterope near SArch/SArt north of CS.
Recommended Mines
- Iron/Copper on the road to CS
- Tin Public_Tin_Mine_&_3_Compression_Furnaces_1986_-947 or right before CS
- Zinc/Lead :
- Merope (2K coords from CS)
- or Caelano (1.3K from CS) with 4 CP Public_Zinc_Mine_at_-1815,_-344 and Public Lead Mine at -1672, -206 with 2 CP, not far from zinc
- Titanium 2053 -509, NE from our camp
Compound 1403. -1064
- 25x Rock Saw
- 18x Carpentry Shop (please chat Takhetu if blades brake)
- 6x Mason's Bench
Compound 1403. -1073
- 1x Pottery Deck
- 1x Vault Kiln
- 1x Barrel Vise
- 1x Chemistry Laboratory
- 1x Pigment Laboratory
- 4x Paper Press (8 hammocks next to them)
- 1x Grain Oven
- 6x Malting Tray
Compound 1386. -1081
- 1x Anvil
- 16x Kettle
- 4x Reactory
- 2x Fleet Furnace (not public)
- 6x Greenhouse
- 6x Flax Hammock
- 1x Hackling Rake
- 1x Hand Loom
- 12x Small Distaff (2 upgraded with pinch rollers to make cable)
- 12x Pottery Wheel
- 24x True Kiln
- 25x Improved Brick Rack
- 1x Kitchen
- 1x Glazier Bench (Soda)
- 1x Glazier Bench (Normal)
- 1x Glazier Bench (Jewel) (empty atm)
- 2x Mason's Bench
- 1x Rock Saw
- 2x Charcoal Hearth
- 2x Charcoal Oven
- 1x Carpentry Shop (upgraded)
- 14x Drying Rack
1384, -1072
- 2x Master's Forge
- 12x Student's Forge (upgraded)
- 2x Master's Casting Box
- 6x Student's Casting Box
1319, -1087
- 5x Firepit (not public)
Current Projects:
Casting/Forge CP
2x Master's Casting Box
- 48 Boards
- 100 Rope
- 400 Firebricks
- 800 Bricks
- 24000 Sand
6x Student's Casting Box
- 144 Boards
- 1200 Firebricks
- 2400 Bricks
- 7200 Sand
12x Student's Forge
- 288 Boards
- 216 Firebricks
- 576 Bricks
TOTAL MATS
- 48 Boards
- 100 Rope
- 1816 Firebricks
- 3776 Bricks
Other Projects:
- 2x Wood Treatment Tank (pending location)
- 1x Gearbox Assembly Table (pending location)
- 1x Heavy Clinker Vat (pending location)
- 1x Glory Hole (pending location)
- 3x Glazier's Bench (normal glass) (pending location)
- 2x Glazier0s Bench (soda glass) (pending location)
Long Term Projects:
Raeli Oven
- 3000 Clay Bricks
*2000 Clay (done) *1500 Wood
- 50 Copper Wire (done)
- 25 Moon Steel Sheeting (done)
- 20 Small Gears (done)
- 10 Bearings (done)
- 10 Cement (done)
- 10 Cut Stone (done)
- 10 Rope (done)
- 5 Crucibles (done)
- 5 Glass Pipes (done)
- 5 Medium Gears (done)
- 3 Iron Bars (done)
- 3 Shovel Blades (done)
- 2 Pinch Roller (done)
- 1 5000+ Quality Carpentry Blade (done)
- 1777 Resin